Skip to content
IN BUILDSegal Habitats

Tide Commons

24-berth floating community, closed-loop utilities.

Sheltered Bay Pilot

// PROGRAM

First habitat platform demonstrating modular berths over a shared floating footprint, with integrated closed-loop power, water, and waste and storm-rated dynamic mooring.

In build at Sheltered Bay Works. A coastline that floats — assembled from the same sections that build a freighter, fitted out for the people who live aboard.

Sheltered Bay Works

Build yard

24

Households

Closed-loop, off-grid

Utilities